Which one of the following is not a step of requirement engineering?

Home | Discussion Forum

Free Online Test

Taiyari24Hour

Which one of the following is not a step of requirement engineering?



View More Related Question

1) What are the kinds of actors used in OOSE ?

2) What is the major drawback of CORE ?

3) To ensure that a given root definition is rigorous and comprehensive, The Lancaster team proposed several criteria that are summarized in the mnemonic CATWOE in Soft Systems Methodology (SSM).Which of the following alphabet is representing an entirely different meaning to SSM ?

4) Which two requirements are given priority during Requirement Management of a product ?

5) Which of the following elicitation techniques is a viewpoint based method?

UP Gk Online Test

taiyari24hour.com

Study 2 Online Says....
Kindly log in or signup.